Scope
Link Dammam’s Second Industrial City to the existing Dammam-Riyadh railway line and King Abdulaziz Port by building a connecting rail line, removing +1.2 million trucks annually from the Dammam-Riyadh road, enhancing factory productivity with efficient logistics solutions, and reducing 2 million cubic meters of carbon emissions.
Expected Effect
- Remover +1.2 million trucks annually from the Dammam-Riyadh road
- Enhance factory productivity through efficient logistics solutions.
- Reduce 2 million cubic meters of carbon emissions.
Target Group
Factories in Dammam’s Second Industrial City; Operators of King Abdulaziz Port in Dammam; Carriers
Contributing to Achieving the Strategic Goal
Achieve "3.5.2 Improve local, regional and international connectivity of trade. & transport networks." by increasing local transport network density, providing more efficient logistics solutions, and enhancing the flow of goods and people.